Oct 16, 2019   2:26 p.m. Vladimíra
Academic information system

Persons at STU


This page displays all publicly accessible information about the desired person. Some information about the person's occupation and offices may be hidden.

doc. Ing. Peter Makýš, PhD.
Identification number: 2751
University e-mail: peter.makys [at] stuba.sk
 
Odborný asistent CSc.,PhD. - Department of Building Technology (FCE)
Vice-dean - Faculty of Civil Engineering

Contacts     Lesson     Publications     Bodies     Supervised theses     Conferences     

Basic information

Basic information about a final thesis

Type of thesis: Diploma thesis
Thesis title:The Port Mall - Lamačská brána, Bratislava
Written by (author): Ing. Daniel Bukov
Department: Department of Building Technology (FCE)
Thesis supervisor: doc. Ing. Peter Makýš, PhD.
Opponent:Ing. Peter Sojka
Final thesis progress:Final thesis was successfully defended.


Additional information

Additional information about the final thesis follows. Click on the language link to display the information in the desired language.

Language of final thesis:Slovak

Slovak        English

Title of the thesis:The Port Mall - Lamačská brána, Bratislava
Summary:The project deals with some parts of building and technological preparation. This preparation helps to realize challenging parts of the project realization and to focus on solid solutions of these parts. The outcome of a quality preparation is a realization within an agreed schedule, with expected financial return and with a quality that exceeds customers' expectations. I have worked out the following to reach the goals: - a technical report of the building site equipment - a situation of site devices for earth works and heavy construction site manifacturing - a time shedule of the building processes including histogram of workers - a methodology of continual concreting of a foundation sceleton The technical report of the building site equipment and construction drawings depict parts of construction equipment and its location, the way of process realization and employed mechanisms. The time schedule of construction describes a construction method and a process design. It helps to control a course of realization. In case of delay, the time schedule provides overview of consequences and points out possible complications in advance. The use of the MS PROJECT allows quick update of the time schedule and creating of numerous schedule options in a short time. The proposed methodology of continual concreting is a suitable tool for a site preparation manager. Based on the methodology, he and a construction manager can plan the realization process in detail. The outcome of a planning is as follows: - a time schedule - a process of realization - a specification of suitable mechanisms - properties specification of a fresh concrete - a number of a hired staff - limits specification of environment and surroundings - a price calculation The submitted diploma thesis deals with the large-scale multifunctional Port Mall center in terms of the site equipment, resource needs, time schedule and the process design methodology of continual concreting of a foundation slab.
Key words:The Port Mall, Bc. Daniel Bukov, Diplomová práca


Display and download files

To display the final thesis assignment form click on the Display the final thesis assignment form icon. The following icons - Final thesis, Thesis appendices, Supervisor's review, Opponent's review - relate to the final thesis and can be downloaded. They could be displayed on condition they have been inserted and are available publicly.

Display the assignment form

Parts of thesis with postponed release:

Final thesis (final thesis appendices) unlimited
Reviews for final thesis unlimited