Research ofthe peak operation of channel hydro-electric power plants- hydrodynamic model

Supervisor: prof. Ing. Peter Dušička, PhD.


Basic information   Workers      


This page shows details on the project. The primary projects are displayed together with a list of sub-projects.

Project description:Peak channel hydro-electric power plants constitute a significant control element of our electric system. They are used especially for the purpose of covering variable load, they constitute the emergency reserve of the system (rotating or from a standstill) and they participate in the regulation of frequency and the transmitted power. These dynamic functions may be utilised in peak channel hydro-electric power plants very efficiently and have recently come to the fore in the operation of the afore-mentioned power plants. Water is the carrier of primary energy in hydro-electric power plants. When water flows in the derivation channels, hydraulic losses occur. Undesirable waves that threaten the related objects of the water constructional works emerge in the peak operation as well. By minimising hydraulic losses and the wave motion during operation, the utilisation of the power capacity of channel hydro-electric power plants may be increased while ensuring dynamic services for the electric system.
Kind of project:APVV ()
Department:Department of Hydraulic Engineering (FCE)
Project identification:APVT-20-046302
Project status:Successfully completed
Project start date :01. 01. 2004
Project close date:31. 12. 2006
Number of workers in the project:1