Research of kpossibilities of the semi-peak-load operation of a canal regulating water power plant

Supervisor: doc. Ing. Peter Šulek, PhD.


Basic information   Workers      


This page shows details on the project. The primary projects are displayed together with a list of sub-projects.

Project description:The largest Slovakian canal power plant (PP) is the Gabčíkovo PP. The fact that the Gabčíkovo - Nagymaros waterwork system was not completed in compliance with the originally contracted project does not allow the originally planned peak-load operation of the Gabčíkovo PP. This PP is contemporarily a continuous-flow one. At this type of operation all aggregates can be in operation at once only in exceptional cases. The semi-peak operation would represent a compromise between the originally designed peak operation and the basically forced continuous-flow operation. The semi-peak operation of the PP results in the increase of the output and power generation in the daily load diagram.
Kind of project:APVV ()
Department:Department of Hydraulic Engineering (FCE)
Project identification:APVT-20-046602
Project status:Successfully completed
Project start date :01. 01. 2004
Project close date:31. 12. 2006
Number of workers in the project:1
Number of official workers in the project:0