May 20, 2019   2:24 a.m. Bernard
Academic information system

Projects


Track constructions for corridor lines.

Supervisor: doc. Ing. Eva Tomášiková, PhD.


Basic information   Workers      


This page shows details on the project. The primary projects are displayed together with a list of sub-projects.

Project description:Slovak Railways were integrated into European Railway Network with corridors IV, V, VI and IX. Completely new criteria for the lines quality and especially geometrical position of track are required. Likewise track construc tions in railway stations at corridors lines are necessary to design in accordance with this modern requirements. Designed project analyzes new, changed criteria of track construction projecting, their impact on application in conditions of corridor railway stations in SR and defines an optimal solution of these constructions in new conditions.
Kind of project:VEGA ()
Department:Department of Transport Construction and Traffic (FCE)
Project identification:1/1144/04
Project status:Successfully completed
Project start date :01. 01. 2004
Project close date:31. 12. 2006
Number of workers in the project:1
Number of official workers in the project:0