Dec 14, 2019   8:29 a.m. Branislava, Bronislava
Academic information system

Projects


Research on utilization of heuristic optimization methods in the process of water management -- energetic plans

Supervisor: doc. Ing. Peter Šulek, PhD.


Basic information   Workers      


This page shows details on the project. The primary projects are displayed together with a list of sub-projects.

Project description:Regulating hydropower plants are significant regulating part of electric supply systems. These power plants are above all mounted to cover the variable load. Hydropower plants are also exploited as failure backup of the network (performing the ancillary services). The efficiency of regulating hydropower plants dynamic properties are close related with optimization methods applied in the process of water management--energetic plans development. Presently the most significant optimization techniques are heuristic methods (genetic algorithms,simulated annealing, harmony search and others). Heuristic methods are basically searching methods controlled by defined strategy and are useful for the searching tasks which do not have any adequate specific algorithm or eventually direct numerical method. The goal of assumed project is to investigate the opportunities of heuristic optimization methods in operation planning of regulating hydropower plants.
Kind of project:VEGA ()
Department:Department of Hydraulic Engineering (FCE)
Project identification:1/0578/11
Project status:Successfully completed
Project start date :01. 01. 2011
Project close date:31. 12. 2013
Number of workers in the project:2
Number of official workers in the project:0